• Construction crews will be working on the Niles Channel Bridge, Mile Marker 25.5, from 9 a.m. — 4 p.m., Aug. 6 — Aug. 10. Traffic will continue to move in both directions, but will shift with a lower speed limit just as it has done previously.
• Crews will also be cutting brush and tree limbs (due to Hurricane Irma) during those same dates and times at Mile Marker 92.8. The left lane of U.S. 1 will be closed.